Vanderleek Roofing

Note installation of roof break between units as well as cant strips on gables to keep water from dripping off the sides of the roof.  26 ga drip flashing installed at eaves to ensure water flows off the roof into the gutter.  

Installation of 1/8" Protecto board over peel and stick.  Board fastened with screws & plates.  2 Ply IKO torchon, 180 gr. base and 250 gr cap sheet, charcoal grey.  Custome vent strip installed with turbines to remove humidity that was condensating in the roofing system due to lack of air flow.